Knoxville sits next to Oak Ridge, where a uranium plant is being rebuilt, the first new non-light-water reactors are under construction and TVA holds a permit for a small modular reactor. We train the electrical crews who build, commission and maintain that work, at your facility or in an in-person class we set up in Knoxville when you ask.

Tennessee runs its own OSHA-approved state plan. Private employers here are inspected by Tennessee Occupational Safety and Health Administration (TOSHA), Tennessee Department of Labor and Workforce Development, not federal OSHA. Every class is live, on the 2027 edition of NFPA 70E, and taught by a Certified Safety Professional. Tennessee electrical safety training requirements →

100+ milesof electrical conduit and cable installed at Y-12's Uranium Processing FacilityNNSA 2024
3,000+people working on the UPF construction site at Y-12NNSA 2024
300 MWper unit at TVA's Clinch River SMR site, with up to four units plannedNeutron Bytes 2026
226,000+KUB electric customers across a 689-square-mile service areaKUB 2026
Open enrollment · live online

Next live virtual classes, open to Knoxville crews

Individual seats, live on Microsoft Teams. Loading class dates… See the class calendar.

Among the teams we have trained in the last year

Training options in Knoxville

Four ways to train your Knoxville crew

Crews we train in and around Knoxville: federal site contractors, advanced nuclear construction, automotive suppliers, public power, universities and hospitals, electrical contractors.

KnoxvilleOak RidgeMaryvilleAlcoaClintonLenoir CityFarragutKingstonLoudonSevierville
Training Option #2On a deadline

Trained this week

Onsite in Knoxville within a few days. Private live virtual as soon as tomorrow, for your people only.

Onsite in daysVirtual next dayAny of our classesSame paperwork
Call (813) 725-0999
Training Option #3Crews at several sites

Private live virtual

Bring workers from every site, in Tennessee and beyond, together with zero travel costs. One live class, your people only.

Your people onlyEvery site joinsCompetency CheckCertificate in 4 hrs
Request a private class
Training Option #4A few people

Monthly open class

Individual seats in our live 1-Day Qualified Electrical Worker class on Microsoft Teams, held once a month.

1-Day QEWLive on TeamsCompetency CheckCertificate in 4 hrs
See class dates

Every qualified electrical worker (QEW) class includes a 2027 NFPA 70E Field Guide, an individual qualification form, a documented Competency Check (75% minimum) and a completion certificate within 4 hours of class. The 4-Hour Electrical Safety Awareness class includes a documented competency check and a certificate of completion. OSHA 10-Hour Outreach can be added to any onsite visit; ask when you request the quote.

What the class covers for Knoxville crews

First-of-a-kind facilities.

New reactor and process buildings get energized system by system while construction continues around them. We teach the handoff from construction rules to operating rules at each energization step.

Federal site rules.

DOE contractor sites work under 10 CFR 851, which lists NFPA 70E among its required standards. We help crews who move between DOE work and private plants keep one consistent set of safe work practices.

Aging plant infrastructure.

Manhattan Project era buildings and decades-old plant distribution still carry load while replacements rise. We cover condition of maintenance and why an old label may not match the gear behind it.

Automotive troubleshooting.

Supplier plants like the DENSO campus in Maryville run dense 480 V distribution and robotic cells. We spend time on when energized diagnostic work is justified and how to set it up.

Quick reference

Knoxville at a glance

Enforcement

TOSHA (state plan); DOE sites under 10 CFR 851

Serving utilities

KUB, Oak Ridge Electric Dept., Clinton Utilities Board (TVA power)

Electrician licensing

State contractor / LLE, local journeyman

Airports

TYS

Time zone

Eastern

Tennessee: what applies to your crews

Enforcement: TOSHA, with federal exceptions

TOSHA, part of the Department of Labor and Workforce Development, runs Tennessee's state plan for private employers and state and local government. Federal workplaces are outside it, and DOE contractor sites in Oak Ridge work under DOE's own worker safety rule, 10 CFR 851.

Licensing: state contractor, local journeyman

The Board for Licensing Contractors licenses electrical contractors for projects of $25,000 and up and issues the Limited Licensed Electrician credential for smaller work. Tennessee has no statewide journeyman card, so individual electrician licensing is local.

Where NFPA 70E fits

OSHA and TOSHA do not enforce NFPA 70E. Private employers use it to show how they meet 1910 Subpart S and 1926 Subpart K, the General Duty Clause covers recognized hazards, and DOE's rule names NFPA 70E directly for its contractors.

Knoxville's electrical work environment

Oak Ridge sets the tone for the region. At the Y-12 National Security Complex, the Uranium Processing Facility moved into bulk electrical installation with more than 100 miles of conduit and cable in place, and NNSA has slated construction completion for 2027. A 245,000-square-foot Lithium Processing Facility is next, replacing functions in the Manhattan Project era Beta-2 building.

Private nuclear work is growing around the federal sites. Kairos Power is building Hermes 1, a 35 MWt salt-cooled test reactor, on the former K-33 gaseous diffusion site, and broke ground on the 50 MWe Hermes 2 in April 2026. A few miles away, the NRC approved TVA's construction permit for a BWRX-300 at the Clinch River site in 2026, though TVA's board still has to approve the final financial commitment.

Knoxville itself runs on manufacturing, healthcare and the University of Tennessee. DENSO's Maryville plant, the company's largest U.S. factory, employs more than 4,000 people in neighboring Blount County. More than 150 nuclear companies operate in the Oak Ridge and Knoxville area, according to NNSA, so a single contractor's crew can move between a federal site, a reactor build and an auto supplier in the same year.

Local market

Nuclear and federal projects around Oak Ridge

These are the Oak Ridge area projects pulling the most electrical labor into the Knoxville region. Several are first-of-a-kind builds with long commissioning phases.

SiteWhat is thereStatus
Uranium Processing Facility
NNSA (Y-12)
Replacement uranium plant at Y-12, with construction slated to finish in 2027 and full operations by 2031.Under construction
Lithium Processing Facility
NNSA (Y-12)
245,000-square-foot facility replacing the Beta-2 building, with construction expected to start in FY2026.Planned
Hermes 1
Kairos Power
35 MWt salt-cooled test reactor on the former K-33 site, expected to be ready in 2028.Under construction
Hermes 2
Kairos Power
50 MWe power-producing reactor, groundbreaking April 2026 and expected in 2030.Under construction
Clinch River Unit 1
TVA
BWRX-300 small modular reactor with an NRC construction permit issued in 2026 and no construction start date set.Planned
DENSO Manufacturing Tennessee
DENSO
Maryville plant with more than 4,000 employees, DENSO's largest U.S. manufacturing site.Operating

Compiled from public sources (NNSA, American Nuclear Society, Neutron Bytes, WBIR, Consulate General of Japan in Nashville, Knoxville News Sentinel) as of October 2026. Details change; verify before relying on them.

Power

KUB and the TVA distributors

The Knoxville Utilities Board distributes TVA power to more than 226,000 electric customers in Knox County and parts of seven surrounding counties, through 64 substations. Oak Ridge has its own municipal electric department, and the Clinton Utilities Board, Loudon Utilities Board and other TVA distributors serve the towns around it, so contractors deal with several distributors' clearance practices across the region.

TVA generates and transmits the power, and its Clinch River site could host up to four 300 MW reactors. Kairos has a power purchase agreement with Google and TVA aimed at 500 MW by 2035. Federal and TVA work sites can fall under different safety jurisdiction than a private plant down the road, so confirm who has jurisdiction before the job starts.

Who we train in Knoxville and East Tennessee

Federal site contractors

Electricians and technicians working for prime and subcontractors at Y-12 and ORNL under DOE's worker safety rule.

Advanced nuclear construction

Construction and startup crews on the Hermes reactors and the Clinch River site.

Automotive suppliers

Maintenance electricians at DENSO in Maryville and other supplier plants along I-40 and I-75.

Public power

Substation, metering and line-side staff at KUB and the smaller TVA distributors, all under TOSHA.

Universities and hospitals

Facilities electricians on the University of Tennessee campus and at Knoxville's medical centers.

Electrical contractors

Knox, Anderson and Blount County contractors moving between federal, industrial and commercial jobs.

Also serving

KnoxvilleOak RidgeMaryvilleAlcoaClintonLenoir CityFarragutKingstonLoudonSevierville

Questions from Knoxville employers

We work at Y-12 or ORNL. Does your class fit DOE requirements?
Our classes are on the 2027 edition of NFPA 70E. DOE's 10 CFR 851 names a specific edition, and each site's contractor sets how its electrical safety program applies it, so check your site program's edition and any site-specific training it requires.
Can you train a startup crew before a reactor or process building is energized?
Yes. Tell us where the project is in its energization sequence and what equipment the crew will touch first. We time the class ahead of that milestone and build examples around it.
Does TOSHA cover a city utility like KUB or Oak Ridge Electric?
Yes. Tennessee's state plan covers state and local government employers, so municipal utilities and public power distributors fall under TOSHA.
Our electrician holds a Tennessee LLE. Is that enough?
An LLE shows installation competence for smaller jobs. NFPA 70E qualification is the employer's documented decision based on training and demonstrated skill for the specific tasks and equipment.
Does finishing the class make someone a qualified electrical worker?
No. Training is one input. Qualified is a determination the employer makes about a specific person on specific equipment, after training plus a demonstration of skills. Every attendee leaves with an individual qualification form and a documented Competency Check so that determination has something to stand on.

What the people in the room say

9.6 / 10 average student rating · 4.9 on Google

★★★★★
“Virtual can never replace hands-on, but the engagement from our instructor and the class made it feel more engaging than some in-person courses I've taken.”
Class participant · Hyperscale data center
★★★★★
“Probably one of the most useful safety courses I've ever attended. Rick genuinely cares about people and their well-being.”
Class participant · Paper mill
★★★★★
“This is the 2nd arc flash training course I've taken and the class was amazing. I feel like I'm leaving the training safer than before I took this class.”
Class participant · Municipal water / wastewater

Train your Knoxville crew on the 2027 edition.

Onsite within a few days, or private live virtual as soon as tomorrow. Need it fast? Call (813) 725-0999.

Get an onsite quote

Local figures compiled from public sources and reviewed by a Certified Safety Professional; details change, verify before relying on them. Sources: www.energy.gov · nukewatch.org · www.ans.org · wbir.com · neutronbytes.com · www.kub.org · www.tva.com · www.aol.com

Request a quoteCall (813) 725-0999