Little Rock is adding a riverfront industrial park, a jet completion center and two planned data center campuses to a grid run largely by Entergy Arkansas and the state's electric cooperatives. We train the electrical crews who build, energize and maintain those sites, at your facility or in an in-person class we set up in Little Rock when you ask.
Private employers in Arkansas are inspected by federal OSHA. Every class is live, on the 2027 edition of NFPA 70E, and taught by a Certified Safety Professional. Arkansas electrical safety training requirements →
Among the teams we have trained in the last year
Four ways to train your Little Rock crew
Crews we train in and around Little Rock: data center construction, port manufacturing, aerospace, military support, utilities and cooperatives, public employers.
What the class covers for Little Rock crews
Campus-scale data centers bring utility-class substations and medium-voltage switchgear onto private property. We cover approach boundaries, switching hazards and who owns which side of the clearance.
New pipe, trailer and logistics lines at the port are commissioned while neighboring buildings run. We teach how to establish an electrically safe work condition when construction and production share a feeder.
Completion and maintenance hangars run ground power, avionics test benches and large hangar distribution. We tie shock and arc flash risk assessment to the gear your technicians actually open.
Arkansas licenses electricians on NEC installation competence. We fill the safe work practice gap that license renewal does not cover, and document it for your qualification records.
Little Rock at a glance
Federal OSHA (private only)
Entergy Arkansas, electric co-ops
State master / journeyman
LIT
Central
Arkansas: what applies to your crews
Enforcement: federal OSHA
Arkansas has no OSHA state plan. A single federal OSHA area office in Little Rock covers all 79 counties. The state's AOSH program offers free consultation but does not enforce, and city, county and school employees have no OSHA coverage.
Licensing: state master and journeyman
The Board of Electrical Examiners in the Department of Labor and Licensing issues master, journeyman, residential, air conditioning and industrial maintenance electrician licenses and registers apprentices.
Where NFPA 70E fits
OSHA does not enforce NFPA 70E in Arkansas or anywhere else, but employers use it to show how they meet 1910 Subpart S and 1926 Subpart K, and OSHA can cite the General Duty Clause when a recognized electrical hazard is left uncontrolled.
Little Rock's electrical work environment
The Port of Little Rock is the busiest industrial address in Central Arkansas. Welspun Tubular makes large-diameter line pipe there and announced a $100 million upgrade in 2024, Faymonville Group is building its first U.S. heavy-load trailer plant, and Amazon started a logistics building of more than 930,000 square feet in July 2025. The port also bought land for an 875-acre megasite in 2025.
Data center work is arriving in two places at once. AVAIO Digital announced a 760-acre campus off 145th Street in January 2026, with 150 MW under contract and a stated path toward 1 GW. Filings at the port show a roughly $1 billion project with five industrial buildings and its own electrical substation, which local press reports tie to Google. The city board adopted data center rules in June 2026 instead of the moratorium some residents asked for.
Aerospace and defense round out the mix. Dassault Falcon Jet completes and services business jets at the Little Rock airport with about 1,400 workers and is adding 800 more under a 2023 expansion. Across the river in Jacksonville, the 19th Airlift Wing keeps the world's largest C-130 fleet flying.
Port, aerospace and data center projects around Little Rock
These are the Central Arkansas sites where electrical crews are busiest now or soon will be. Several are early, so we list them by status.
| Site | What is there | Status |
|---|---|---|
| AVAIO Digital Leo AVAIO Digital | 760-acre campus off 145th Street, 150 MW contracted with Entergy Arkansas and first energization targeted for June 2027. | Planned |
| Port of Little Rock data center Reported as Google (filed by Willowbend Capital) | About $1 billion, with filings showing five industrial buildings and a substation; Google has not confirmed the project. | Planned |
| Amazon logistics facility Amazon | More than 930,000 sq ft at the port, started in July 2025 with opening expected in 2027. | Under construction |
| Faymonville heavy-load trailer plant Faymonville Group | $100 million plant, the company's first U.S. production site, planned to grow to 624,000 sq ft. | Under construction |
| Welspun Tubular pipe mill Welspun | Large-diameter line pipe plant at the port, in Central Arkansas since 2007 and upgraded under a $100 million expansion. | Operating |
| Dassault Falcon Jet completion center Dassault Aviation | Business jet completion and service center at the Little Rock airport with about 1,400 workers. | Operating |
| Little Rock Air Force Base U.S. Air Force | 19th Airlift Wing base in Jacksonville with more than 7,600 on-site military and civilian jobs. | Operating |
Entergy Arkansas and the cooperative grid
Entergy Arkansas serves about 738,000 customers in 63 counties and supplies the AVAIO campus under a 150 MW contract. Its fleet includes Arkansas Nuclear One near Russellville, with two units of 836 MW and 988 MW on Lake Dardanelle, plus the White Bluff and Independence plants.
Arkansas Electric Cooperative Corporation is headquartered in Little Rock and generates and transmits power for 17 distribution cooperatives that serve about 500,000 customers across 62 percent of the state's land area. A contractor working the suburbs and rural counties around Little Rock can cross from Entergy switching practices to a cooperative's in a single week.
Who we train in Little Rock and Central Arkansas
Electrical subs and commissioning crews on the campuses planned south of the city and at the port.
Maintenance electricians at the pipe, trailer and industrial plants in the Port of Little Rock industrial park.
Hangar and avionics technicians at the business jet completion center at the airport.
Facility crews and contractors maintaining Little Rock Air Force Base in Jacksonville.
Line, substation and generation crews working for Entergy Arkansas and the electric cooperatives.
City, county and school maintenance staff in Pulaski County, who have no OSHA coverage and rely on a written program.
Also serving
Questions from Little Rock employers
Can you train crews working on the new data center campuses south of Little Rock?
Our electricians hold Arkansas journeyman and master licenses. Do they still need NFPA 70E training?
We run a municipal plant in Pulaski County. Does OSHA cover our electricians?
Can you hold the class at our plant in the Port of Little Rock?
Does finishing the class make someone a qualified electrical worker?
What the people in the room say
“Virtual can never replace hands-on, but the engagement from our instructor and the class made it feel more engaging than some in-person courses I've taken.”
“Probably one of the most useful safety courses I've ever attended. Rick genuinely cares about people and their well-being.”
“This is the 2nd arc flash training course I've taken and the class was amazing. I feel like I'm leaving the training safer than before I took this class.”
Train your Little Rock crew on the 2027 edition.